Renegade Reserve Lighting Replacement

  • Major infrastructure projects
  • Construction

Project summary

We are replacing the reserve lighting at Renegade Reserve with new LED lighting.

Project works

New lighting is being installed at Renegade Reserve as part of a program to replace reserve lights using metal halide technology with more efficient LED lighting.

The project includes all the pole and bollard lights on the reserve, and will be completed in three stages:

  • Stage 1 - Existing non-functional lights will be removed and new underground cable system installed.

  • Stage 2 - New poles and lights will be installed.

  • Stage 3 - New bollard lights will be installed along the footpath on the east side of the lake, and in the smaller reserve leading to Renegade Path.

Project status

Stage 1 is now complete

Stage 2 is now complete

Stage 3 works are scheduled for February 2024. New bollards will be installed along the footpath and existing bollards in the area adjacent to Renegade Path will be replace.

Design
  • Date
    2022
  • Progress
    Completed
Stage 1
  • Date
    March 2023
  • Progress
    Completed
Stage 2
  • Date
    July 2023
  • Progress
    Completed
Stage 3
  • Date
    February 2023
  • Progress
    Not started
  • New Bollards will be installed along the path
  • New pole lights, as seen here, have been installed around the reserve.
  • These existing bollards will be replaced.
Previous ImageNext Image

Location

Koorda Brace, Rockingham