Rockingham 31° 18 °

Proposed Resource Recovery Facility (Waste to Energy)

A Development Application has been submitted for a Resource Recovery Facility (Waste to Energy) at Lot 1 Office Road, East Rockingham. The application is required to be determined by the Metro South-West Joint Development Assessment Panel but first, we'd like to receive your feedback.

The proposed development includes the following:

  • Construction and operation of a Resource Recovery Facility.
  • The facility comprises an administration building, waste bunker, combustion system, boiler, bottom ash handling and treatment area and other associated infrastructure.
  • The absolute maximum building height is 60.3 metres which relates to the 'stack' and is setback 176.5 metres from Office Road.
  • The development provides for separate access points from Office Road to accommodate private vehicles and commercial vehicles.
  • A 10 metre wide landscape strip is proposed along Office Road.

​Plans and information on the proposed development are available below.

Title Type Size and format
DA Report - Proposed Waste to Energy Facility Document PDF 15.8 MB
Submission Response Form Document PDF 735 kb

​Share your thoughts now

You can provide your feedback on this application

  • ​online via Rock Port
  • online via email
  • ​mail the submission response form to: Chief Executive Officer, PO Box 2142, Rockingham DC 6967.

​Written submissions may be made in writing and lodged with the Chief Executive Officer, by no later than 21 December 2018​.

​Please note that any written submission received in response to this invitation may be placed on the public record and be available for public inspection.