Baldivis Road Upgrade

Location

Baldivis Road from Highbury Boulevard to Safety Bay, Road Baldivis
Stage 1: Highbury Boulevard to Makybe Drive
Stage 2: Makybe Drive to Safety Bay Road

Funding

Metropolitan Regional Road Group (MRRG)

Budget

$2,400,000

Scope of Works

The project is being carried out in two stages. Stage one consisted of works on Baldivis Road from Highbury Boulevard to Makybe Drive and was completed in February 2017.  Stage 2 works consist of upgrading Baldivis Road from Makybe Drive to Safety Bay Road to a boulevard-style streetscape including a raised median, turning lanes and cycle lanes. 

This project will also replace the "left in-left out" treatment with a seagull treatment at Stillwater Drive allowing vehicles to turn right onto Baldivis Road towards Safety Bay Road. 

Project Schedule

Construction works commenced in May 2017 and the works are scheduled to be completed in September 2017.

Title Format Size
Baldivis Road Upgrade Drawings PDF 1.34MB